1 gpf (3.8 lpf) or
1.4 gpf (5.3 lpf)
Turn here to adjust
the water level.
4. Complete the Installation
Remove the Packing Material
NOTE: Do not remove the pump hose clamps.
Remove and discard the protective materials used in shipping.
Cut the wire holding the pump to the back wall of the toilet.
Discard the wire tie.
If the pump has shifted during shipping or installation, reposition
it so it is not touching the back side wall of the toilet.
Complete Connections
Install the bidet seat following the installation instructions packed
with the bidet seat.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of
the nuts should stop leakage.
Plug the toilet electrical cord into a Class A GFCI or RCD
receptacle.
Adjust the tank water level to the proper marked waterline by
rotating the threaded rod clockwise to raise the water level or
counterclockwise to lower the water level.
Carefully set the cover onto the tank.
Kohler Co.
7
1092035-2-A