Descargar Imprimir esta página

dormakaba BEST Wi-Q Instrucciones De Instalación página 2

Publicidad

Drop Ceiling Installation
1
ATTACH CEILING GRID
BRACKET ASSEMBLY
D
1
1
Attach the ceiling grid bracket
assembly (D) to the ceiling grid.
2
ATTACH MOUNTING
BRACKET ASSEMBLY
3
B
(2x)
1
Attach the mounting bracket
assembly (C) to the ceiling grid
bracket assembly (D).
3
CONNECT
CABLES
G
Connect the Ethernet cable (H) and the DC
power cable (G) to the gateway (A). The cables
must exit the ceiling in the area shown.
5
INSTALL
RETAINING
SCREW
NOTE: #6-19 x 1/4"
retaining screw (F)
optional to use
Install the #6-19 x 1/4"
retaining screw (F).
BEST is a trademark of dormakaba USA Inc.
2
2
Position the ceiling grid between the
fingers on one side of the ceiling grid
bracket assembly (D).
1
4
2
1
3
C
2
2
Slide the mounting bracket assembly (C) into
the four hooks of the ceiling grid bracket
assembly (D) until it is centered.
NOTE:
Ethernet cable (H)
not included, required for
install; DC power cable (G)
optional to use, not needed
if powered by PoE
H
H
F
SLIDE CEILING GRID
BRACKETS TOGETHER
3
Slide the two ceiling grid brackets (D) together so that
both sides of the ceiling grid are trapped between the
fingers of the ceiling grid brackets.
TIGHTEN
SET SCREWS
D
3
The gateway antennas (B
on the end of the mounting bracket
assembly (C) with the narrow tab.
4
SLIDE/SNAP
ON GATEWAY
G
A
1
Slide the gateway (A) onto the
mounting bracket assembly feet (C).
2/8
D
3
C
4
4
) will be
Tighten the two #6 x 1/4"set screws
(2x)
(included in assembly C) using
a #2 Phillips screwdriver.
C
1
A
C
2
A
2
Snap mounting bracket assembly
feet (C) into place.
A89995_A
2019 All rights reserved.
©

Publicidad

loading