Shelf Installation
NOTE:
1
CONNECT
not included, required for
CABLES
install; DC power cable (G)
optional to use, not needed
if powered by PoE
H
2
A
1
Connect the Ethernet cable (H) and the DC power cable (G)
to the gateway (A).
2
Route the Ethernet cable (H) and the DC power cable (G)
into the channel on the bottom of the gateway (A).
Electrical Box Installation
1
ROUTE
CABLES
C
E
(2x)
2
G
1
H
1
Route the Ethernet cable (H) and
the DC power cable (G) through the
mounting bracket assembly (C) as shown.
3
SLIDE/SNAP
ON GATEWAY
A
1
1
Slide the gateway (A) onto the mounting bracket
assembly feet (C) until it snaps into place.
2
Push any excess cable
back into the wall.
BEST is a trademark of dormakaba USA Inc.
Ethernet cable (H)
1 2
INSTALL
ANTENNAS
1
G
Install the antennas (B
onto the gateway (A) using
4-6 in-lb torque.
ATTACH MOUNTING
BRACKET ASSEMBLY
NOTE:
Ethernet cable (H)
not included, required for
install; DC power cable (G)
optional to use, not needed
if powered by PoE
2
Attach the mounting bracket assembly (C)
to the electrical box using the two provided
#6-32 x 3/4" machine screws (E
4
INSTALL
RETAINING
SCREW
C
2
Install the #6-19 x 1/4"
retaining screw (F).
B
(2x)
A
)
(2x)
2
CONNECT
CABLES
A
1
Connect the Ethernet cable (H)
and the DC power cable (G) to
(2x)
).
the gateway (A).
F
NOTE:
#6-19 x 1/4"
retaining screw (F)
optional to use
4/8
3
PLACE ON
SHELF
B
(2x)
A
Place the gateway (A) on the shelf.
The antennas (B
) must be
(2x)
oriented vertically when installed.
NOTE:
Ethernet cable (H)
H
2
1
not included, required for
install; DC power cable (G)
G
optional to use, not needed
if powered by PoE
2
Route the Ethernet cable (H) and the DC
power cable (G) into the channel on the
bottom of the gateway (A).
5
INSTALL
ANTENNAS
B
A
Install the antennas (B
(2x)
) onto the gateway (A)
using 4-6 in-lb torque. The antennas (B
be oriented vertically when installed.
A89995_A
2019 All rights reserved.
©
COMPLETE
(2x)
) must
2x
COMPLETE