Palram CARNIVAL Manual De Instrucciones página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 55
Notes During Assembly
.
Use a soft platform below the parts to avoid scratches and damages.
.
Please note you install the panels with the UV protected side out (marked with "THIS SIDE OUT")
remove plastic film before inserting panels and locking in place.
.
If the panels received with the product are clear / white, please remove only the plastic sticker as panels are locked in place..
Product dimensions can be adjusted to your specific needs:
1. The wall -mounting profile (top -back) can be adjusted from 260 to 305 cm (102.4" to 120") above ground. The adjusting is done when
measuring and drilling (Step 6).
Please note the installation recommendations' height suggested in Diagram A.
It is possible to fix the Patio Cover back wall height at the lowest point of 260 cm/102.4". This method is optional if the assembly conditions
and exterior walls do not allow to follow the suggested installation as appears in the manual.
Please note that the product appearance may slightly change as a result, however snow load weight does not change.
2. Poles distance from the wall can be adjusted from 226 to 286 cm (89" to 112.5") as suggested in Diagram B1.
Poles distance from the side edges can be adjusted from 5 to 54 cm (2" to 21.3") as suggested in Diagram B2.
The adjusting is done after assembly and before anchoring (Step 26) by sliding poles and profile 7507+1041 at the roof profiles'channels.
3. Wall mounting and distance from the wall determine the roof angle and the total depth of the product (distance of gutter from the wall).
Higher wall mounting and shorter distance between wall and poles increase the roof angle and shorten the total depth as suggested in
Diagram C.
MSteps
Step 3: Choose which side to install the extension, once positioning complete, drill holes using drill #6, according to the exact
position appears in Diagram A.
Step 6:
Site surface needs to be leveled (mainly below the poles).
Prior to enlarging the Patio Cover, several parts need to be dismantled, it is recommended to keep them in a safe place
for future use.
The wall anchoring kit supplied with this product is suitable only for concrete walls. Other wall types need an
accordant wall fixation kit. (Contact your supplier)
Step 12: Apply silicone sealants above beam 7288 + 7509, in order to prevent water from seeping in.
Step 13: Important! If you purchased the reinforcement kit compatible for Zone 2A, you must follow the instructions within the
reinforcement kit, and reinforce all profiles 1043 + 1044.
Step 14: Make sure that the angle between the back wall profile and the panel supporting profiles is 90 degrees.
Step 16: Please note: once you have drilled the holes in accordance with assembling the extension on either right or left side,
please check the gapes created to ensure it has been properly connected and assembled.
Step 24: Apply silicone sealants on the inner part of 7997, and connect to the profile as depicted in drawing 24a.
Do not tighten screw 4043 yet, in order to allow the final adjustments done in step 26b.
Step 26b: Adjust the gutter head's angle according to your needs and tighten screws 4043.
Step 26a+26c: Please adjust the poles (inside out and sideways) by sliding them to their final position prior to anchoring. Make
sure that the poles distance from the Patio cover side edge does not exceed 54 cm/21.3".
Please note: Anchoring this product to the ground is essential to its stability and rigidity. It is required to complete this stage
(Step 27) in order for your warranty to be valid.
*Tighten all screws when completing assembly.
260-305cm
102.4"-120"
UMME
5 51
5
I54cm
2"-21.3"
2'-21.3"
I
I
O

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

705745

Tabla de contenido