ABB RVT Serie Instrucciones De Instalación Y De Funcionamiento página 53

Ocultar thumbs Ver también para RVT Serie:
Tabla de contenido

Publicidad

V nom
ON-Delay
OFF-Delay
Sequence
Q step
C/k
Target cos j
4.3.2.3 T Probes commissioning
RVT can connect up to eight temperature probes in a daisy chain. Each probe needs to
be commissioned as following procedures before it can be used.
Each probe has to be recognized one by one:
-
connect the probe to the temperature probe input (one probe only)
-
click on a row to assign a probe number
-
click on the "Start" button
-
the RVT recognize automatically the probe address
-
restart the same procedure for each probe
When one of the probes has a problem, it can be cleared by clicking the clear button.
A unique address will be assigned to each activated probe after the recognition
completes.
52 Measurements and Settings ç Power Factor Controller RVT
Nominal bank voltage.
Switching ON delay time.
Switching OFF delay time.
Relative reactive power value of each output.
Smallest reactive power difference between steps.
Set the starting current
Target displacement power factor.
Figure 45: Temperature probe auto recognition

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rvt6Rvt12

Tabla de contenido