Commissioning And Operation - WIKA PG43SA-C Manual Del Usuario

Ocultar thumbs Ver también para PG43SA-C:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation / 9. Specifications
5. Commissioning, operation

5.5 Commissioning and operation

EN
For pressure compensation, open the vent valve for a short time and
then close it again directly, see chapter 2.3.
The vent valve remains closed during operation.
Only through a brief venting of the case before each
pressure measurement can the pressure be read correctly.
5.7 Autoclaving
Ensure that, before the start of the autoclaving process, the vent
valve has been closed.
Carry out the autoclaving process. For performance limits see
chapter 9 "Specifications".
Allow the instrument to cool to ambient temperature.
By briefly opening the vent valve, the pressure difference between
the atmosphere and the sealed case will be eliminated.
9. Specifications
Permissible temperature
Autoclaving
Ingress protection per IEC/EN 60529
IP68 (only with closed vent valve)
4
≤ 134 °C, ≤ 20 minutes
WIKA additional information PG43SA-C, autoclavable version

Publicidad

Tabla de contenido
loading

Tabla de contenido