dard cable with round wire cross-section can be
used. Cable diameter 4.5 ... 7 mm, protection
IP 65.
The M12 x 1 plug connection requires a ready-
made cable with plug.
1
2
3
R
L
L-
L+
PA
1
Abb. 35: Wiring plan, Transistor output with valve plug
ISO 4400
1
Max. level detection
2
Min. level detection
P
Potential equalisation
A
R
Load resistance (contactor, relay, etc.)
L
Max.
2
1
3
4
R
L
-
+
Abb. 36: Wiring plan (housing), transistor output with
M12 x 1 plug connection
1
Brown
2
White
3
Blue
4
Black
R
Load resistance (contactor, relay, etc.)
L
5
Setup
5.1
Indication of the switching
status
The switching status of the electronics can be
checked via the signal lamp integrated in the
upper part of the housing.
5.2
Simulation
The LFV 200 has an integrated function for
LFV 200 • Tuning Fork
1
2
3
R
L
L-
L+
PA
2
Min.
2
1
3
4
R
L
+
-
simulation of the output signal which can be ac-
tivated magnetically. Please proceed as follows:
→
Hold the test magnet (accessory) against
the circle symbol with the label "TEST" on
the instrument housing
Abb. 37: Simulation of the output signal
The test magnet changes the current switching
condition of the instrument. You can check the
change on the signal lamp. Please note that
all connected device are activated during the
simulation.
Vorsicht:
It is absolutely necessary that you remo-
ve the test magnet from the instrument
housing after the simulation.
5.3
Function chart
The following chart provides an overview of
the switching conditions depending on the set
mode and the level.
Level
Swit-
ching
status
Mode
closed
max.
Mode
open
max.
5 Setup
Con-
Con-
Con-
trol
trol
trol
lamp
lamp
lamp
Yellow
Green
Red -
- co-
- vol-
fault
verage
tage
signal
indica-
tion
17