Descargar Imprimir esta página

Pentair Raychem JBM-100-A Instrucciones De Instalación página 3

Ocultar thumbs Ver también para Raychem JBM-100-A:

Publicidad

Idiomas disponibles

Idiomas disponibles

3
• Lightly score outer jacket around and down as shown.
• Bend heating cable to break jacket at score, then peel off
jacket.
Do not cut braid.
4
• Determine heating cable type and continue as shown.
VPL
XTV, KTV
BTV, QTVR
THERMAL MANAGEMENT SOLUTIONS
7 1/2 in
(190 mm)
Go to Step 5A
Go to Step 5B
Go to Step 5C
EN-RaychemJBM100A100A6-IM-H56344      03/13
5A
• Push braid back and
bunch as tight as
possible.
Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Unwind heating element,
cut and remove as
shown.
• Lightly score clear
jacket around and
down as shown.
• Bend heating cable
to break jacket at the
score then peel off
jacket.
• Push braid forward. Use
a screwdriver to open
braid.
• Bend heating cable and
work it through opening
in braid.
• Remove insulation
from ends of bus
wires.
• Pull braid tight to
make pigtail.
VPL
6 in
(152 mm)
6 in
(152 mm)
1/2 in
(13 mm)
Go to Step 6
3 / 10

Publicidad

loading

Este manual también es adecuado para:

Raychem jbm-100-a6