Connection To The Mains - Diamond OASI 8M BM/LUX Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. FILLING AND EMPTYING THE BASIN
1.
The basin must be filled manually, taking care not to fill above the level indicated on the basin walls.
2
. The machine gives an acoustic warning signal to advise you when water must be added to the basin.
3.
To empty the basin, open the tap fitted on one of the machine's sides.

8. CONNECTION TO THE MAINS

1
. Ensure that mains voltage and frequency are the same as those stated on the rating plate
to the appliance. . Ensure that the supply socket:
2
rated current as set out on the rating plate;
magnetic switch (also known as ground fault interrupter) with In = rated value as stated on the rating
plate; - differential with Id sensitivity = 30 mA.
room.
4.
Make sure the environment is suitable for the power supply cable provided. The cable of the
appliance is H05 VVF, designed for internal use. For installation in other than internal settings, it will be
necessary to replace the cable with the appropriate type (for example H07 VVF for external settings).
5
. Insert the plug in the socket. The machine is not supplied with a plug. Provide the power supply cable
with a plug fulfilling the power requirements indicated on the rating plate (do not use three-way adapters
and reduction adapters) (see fig. 6).
9. CONTROLS
The appliance features controls situated in a protected panel.
the appliance.
2. Basin resistor switch:
lamp switch:
to switch on the heating lamps.
lamps.
5. Cover lifting switch:
Position I to lower.
6. Light switch:
water must be added (see fig. 7).
10. CHECKING CORRECT OPERATION
Make sure that: 1.
the plug is connected; . cover is open;
light lit up); . heating lamps are on; . water level in the bain-marie basin is within the limits.
4
any obstructions in front of the float hole. . Check that the set temperature is correct.
machine away from inflammable material or any danger of explosion.
Operator's guide
All manuals and user guides at all-guides.com
a)
is properly earthed;
c)
complies with the IEC regulations:- differential thermal-
3
. Ensure that there is no danger of explosion (AD) in the
to switch on the resistors of the bain-marie basin.
4. Energy-regulator:
to open and close the cover - Position II to lift - Position O to stop -
to turn on the internal light.
2
5
7
7
b)
fulfils the requirements of the
1. Thermostat:
to adjust the temperature in
to adjust the intensity of the heating
7. Water level alarm:
signalling when
3
. bain-marie resistor switch is on (green
(A)
attached
3. Heating
6.
Remove
8.
Keep the
SLO
I
UK
D
E
F
NL
P
S
DK
FIN
B
GR
CZ
EE
LV
LT
H
M
PL
SK

Publicidad

Tabla de contenido
loading

Tabla de contenido