Carico Ultra-Tech WH-750 Manual De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP "B"
After the installation is completed on your new Ultra Tech Water Filtration
System the tank will need to be "backwashed".
1. Turn the right side or outlet valve handle (red handle) to
the left or closed position.
Looking at the top of the main valve, press the red button
on the handle and turn the handle clockwise (right) to the
backwash position. (See Figure A).
Attach the hose adapter fitting (included in the installation
kit box) on the side of the backwash valve. (See Figure B).
Note: There are two adapters. One that is threaded for a
standard garden hose (not included). One that is ribbed for
5/8" tubing (not included).
2. After the adapter and your hose selection has been installed, slowly turn on the main
water supply.
Slowly start filling the tank with water (Approx. 2 to 5 minutes) to clear out any air
pockets and fine particles. The water streaming out of the tubing or hose on the side of
the valve will start coming out very dark. Continue this process until the water streaming
out becomes clear (approximately 2 to 3 minutes).
3. Turn the main valve to the right, to the Rapid Rinse position.
Run the water until clear. (See Figure C).
4. Turn the main valve to the Filtering position and turn the
(Red) outlet valve to the right or open position.
5. Go inside of house or building and turn on the faucets and
shower to remove the air from the water lines. Let run 20-30 seconds.
6. Check for leaks.
4
Figure A
Figure B
Figure C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Wh-500

Tabla de contenido