Water Ace R50VLT Manual Del Usuario página 4

Bomba sumergible de sumidero/ bomba de efluente de hierro fundido
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Vertical float switch installation (for replacement)
Vertical switch is pre-installed at the factory.
See Figures 1 and 2.
1. Mount the bracket to the switch body.
2. Mount the float on to the rod.
3. Mount the retaining strap and float stop on to the rod.
4. Turn the switch upside down and slide the rod into the
switch housing.
5. Fasten the rod with the pin.
6. Mount the switch assembly on the pump.
Figure 1: Make sure pin engages switch rod (Step 4).
WA534
Switch Housing
Bracket
4A
4B
Figure 2: Vertical switch assembly.
5284 0206
4
5
1
Float
Rod
4
2
Float
Retaining Strap
3
Float Stop
6
Pin
5269 0106

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

R75vlt

Tabla de contenido