Wayne Dalton Torque Master Plus 9100 Manual De Instrucciones página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4
Positioning Bottom Section
Center the bottom section in the door opening. Level the section using wooden shims (if
necessary) under the bottom section. When the bottom section is leveled, temporarily hold it
in place by driving a nail into the jamb and bending it over the edge of the bottom section on
both sides.
5
Attaching Vertical Tracks To Jambs
IMPORTANT: IF YOUR DOOR IS TO BE INSTALLED PRIOR TO A FINISHING CONSTRUCTION
OF THE BUILDING'S FLOOR, THE VERTICAL TRACKS AND THE DOOR BOTTOM SECTION
ASSEMBLY SHOULD BE INSTALLED SUCH THAT WHEN THE FLOOR IS CONSTRUCTED, NO
DOOR OR TRACK PARTS ARE TRAPPED IN THE FLOOR CONSTRUCTION.
IMPORTANT: THE TOPS OF THE VERTICAL TRACKS MUST BE LEVEL FROM SIDE TO SIDE.
IF THE BOTTOM SECTION WAS SHIMMED TO LEVEL IT, THE VERTICAL TRACK ON THE
SHIMMED SIDE MUST BE RAISED THE HEIGHT OF THE SHIM.
NOTE: Make sure the counterbalance lift cable is located between the track rollers and the
door jamb.
Starting on the left hand side of the bottom section, remove the nail. Position the left hand
vertical track assembly over the track rollers of the bottom section and install, as shown. Drill
3/16" pilot holes into the door jamb for the lag screws.
Loosely fasten jamb brackets and flag angle to the jamb using 5/16" x 1-5/8" lag screws.
Tighten lag screws, securing the bottom jamb bracket to jamb, maintain 3/8" to 5/8" spac-
ing, between the bottom section and vertical track. Hang counterbalance lift cable over flag
angle. Repeat same process for other side.
Flag
angle
Vertical
5/16" x 1-5/8"
track
Lag screws
assembly
Jamb
bracket
Track
Bottom
rollers
section
6
Attaching Strut(s) To Section
NOTE: Refer to Package Contents or Breakdown Of Parts, to determine which type of strut
you received.
IF YOUR DOOR CAME WITH A STRUT (U - SHAPED): Place the strut (U-shaped) over the
top rib of the top door section, as shown. Fasten each end of the strut to the end cap with
(2) 1/4" - 20 x 11/16" self drilling screws. Fasten center of the strut as shown to the rib
using (2) 1/4" - 14 x 5/8" self tapping screws, one 6" to the left and one 6" to the right of the
center line of the top door section.
IF YOUR DOOR CAME WITH A STRUT (ASYMMETRICAL): Place the asymmetrical strut
over the top rib of the top door section, as shown. Fasten each end of the asymmetrical
strut to the end cap with (2) 1/4" - 20 x 11/16" self drilling screws. Fasten center of the
asymmetrical strut as shown to the rib using (2) 1/4" - 14 x 5/8" self tapping screws, one 6"
to the left and one 6" to the right of the center line of the top door section. Fasten both wall
and the long leg of the asymmetrical strut, as shown using (2) 1/4" - 14 x 5/8" self tapping
screws every 30 - 36 inches. (Approximately 18 self tapping screws per 18' asymmetrical
strut)
IMPORTANT: WHEN SECURING THE ASYMMETRICAL STRUT TO THE TOP SECTION, IT IS
RECOMMENDED NOT TO INSTALL ANY FASTENERS INTO THE SHORT LEG OF THE ASYM-
METRICAL STRUT.
12R FA Or 15R FA
12R QI
15R QI
Flag angle lag screw locations
3/8" to 5/8"
Spacing
Bottom section
Vertical track
Track roller
Floor
7
Attaching Drawbar Operator Bracket
NOTE: If you're installing a drawbar operator, the drawbar operator bracket must be mounted
and secured prior to installing top section.
IMPORTANT: TO AVOID POSSIBLE DAMAGE TO YOUR DOOR, WAYNE DALTON RECOM-
MENDS REINFORCING THE TOP SECTION WITH A STRUT.
IMPORTANT: WHEN CONNECTING A DRAWBAR OPERATOR TYPE GARAGE DOOR OPENER
TO THIS DOOR, A WAYNE DALTON OPERATOR/ DRAWBAR OPERATOR BRACKET MUST
BE SECURELY ATTACHED TO THE TOP SECTION OF THE DOOR, ALONG WITH ANY STRUT
PROVIDED WITH THE DOOR. THE INSTALLATION OF THE DRAWBAR OPERATOR MUST BE AC-
CORDING TO MANUFACTURER'S INSTRUCTIONS AND FORCE SETTINGS MUST BE ADJUSTED
PROPERLY.
Prior to installing the top section, locate the center of the top section and seat the drawbar
operator bracket on top of the top section. For retro fit applications, the drawbar operator
bracket must be aligned with an existing drawbar operator and positioned on top section
so it bridges the transition point of the section thickness. Install (2) #12 x 1/2" phillips head
screws on the back side of drawbar operator bracket. Clamp drawbar operator bracket to
strut (if supplied) with vise clamps. Attach (6) 1/4" - 14 x 5/8" self-tapping screws to the
drawbar operator bracket. Remove vise clamps.
NOTE: If a strut was installed, you can use two of the 1/4" - 20 x 11/16" self-drilling screws
previously used to attach the strut instead of two 1/4" - 14 x 5/8" self-tapping screws when
attaching drawbar operator bracket to strut.
NOTE: When attaching drawbar operator bracket to top section with strut, apply additional
pressure to thread into the strut.
8
Attaching Top Fixtures To Top Section
To install the top fixtures, align the top holes in the top fixture base with the second set of
holes in the end cap of the top section. Fasten to section using (4) 1/4" - 14 x 5/8" self tap-
ping screws. Secure the top fixture slide to the fixture base loosely using (2) 1/4" - 20 x 5/8"
carriage bolts and (2) 1/4" - 20 flange hex nuts. Insert short stem track roller into top fixture
slide. Repeat the same process for the right hand side.
NOTE: The top fixture slide will be tightened and adjusted later, in step, Adjusting Top Fixture.
NOTE: Ensure the top fixture slide is able to slide along the top fixture base. If needed, loosen
the 1/4" - 20 flange hex nuts.
9
Stacking Sections
NOTE: The sections can be identified by the graduation of the factory installed graduated end
hinges. The smallest graduated end hinge on section should be stacked on top of the bottom
section, with each graduated end hinge increasing as the sections are stacked.
NOTE: Make sure graduated end and center hinges are flipped down, when stacking another
section on top.
NOTE: Larger doors will use long stem track rollers with double graduated end hinges.
Place track rollers into graduated end hinges of remaining sections.
With assistance, lift second section and guide the track rollers into the vertical tracks. Lower
section until it is seated against bottom section. Flip hinges up. Fasten center hinge(s) first;
then end hinges last using 1/4" - 14 x 5/8" self tapping screws.
NOTE: To prevent center hinge leaf from rotating, first secure the top middle hole of the cen-
ter hinge leaf with one 1/4" - 14 x 5/8" self-tapping screw then secure the other two holes.
NOTE: Larger doors with double graduated end hinges, fasten both hinges to connect the
sections using 1/4" - 14 x 5/8" self-tapping screws.
Repeat same process for other sections, except top section.
IMPORTANT: PUSH & HOLD THE HINGE LEAF SECURELY AGAINST THE SECTIONS WHILE
SECURING WITH 1/4" - 14 X 5/8" SELF TAPPING SCREWS. THERE SHOULD BE NO GAP
BETWEEN THE HINGE LEAVES AND THE SECTIONS.
NOTE: Install lock at this time (sold separately). See optional installation step, Side Lock.
10
Stacking Top Section
Place the top section in the opening. Install a nail to prevent the top section from falling
backwards. Now, flip up the hinge leaves, hold tight against section, and fasten center hinges
first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is critical.
Position flag angle or wall angle between 1-11/16" (43 mm) to 1-3/4" (44 mm) from the
edge of the door; tighten the bottom lag screw. Flag angles must be parallel to the door sec-
tions. Repeat for other side.
IMPORTANT: THE DIMENSION BETWEEN THE FLAG ANGLES OR WALL ANGLES MUST BE
DOOR WIDTH PLUS 3-3/8" (86MM) TO 3-1/2" (89 MM) FOR SMOOTH, SAFE DOOR OPERA-
TION.
FOR QUICK INSTALL TRACK: Complete the vertical track installation by securing the jamb
bracket(s) and tightening the other lag screws. Repeat for other side.
6

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Torque master plus 9605

Tabla de contenido