Initial Inspection - Nexxt Solutions NHE-S100 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Load wire
5. Live wire
6. Neutral wire
7. Ground wire
4
5 6 7

Initial inspection

Before installing the electrical xture, ensure that all parts
are included in the package. If any part is missing or
damaged, do not attempt to assemble, install, or operate
this product.
Estimated installation time: about 30 minutes.
Tools that may be required but are not included for
installation
1. Phillips screwdriver
2. Flathead screwdriver
3. Pliers
4. Wire strippers/cutters
5. Circuit tester
6. Work gloves
7. Electrical tape
8. Safety goggles
1
2
3
4
5
6
7
8

Publicidad

Tabla de contenido
loading

Tabla de contenido