Hardware installation

IMPORTANT
For safety, properly ground the switch
Always follow the code standards when installing wired
connections.
Step 1
Shut power off at the breaker
Find the breaker that controls the circuit for the junction
box where the smart light switch will be installed. Turn it to
the OFF position.
Place tape over the circuit breaker switch and verify that
power is o .
Note: you can use the circuit tester at this point to verity
that power is cut o .
ON
OFF
ON
OFF
ON
OFF
Step 2
Remove the original switch from the wall box
Identify the Line, Load, Neutral and Ground wires.
Neutral
Note: If the existing switch has two jacks, you may nd 5
wires or more. Identify the neutral, line, load and ground
wires. This smart switch only needs to use these 4 wires,
since it does not require the connection of additional
circuits.
Ground
Line
Load
Switch
(Line/Load)