Descargar Imprimir esta página

SANUS VuePoint F32 Manual Del Usuario página 14

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
2-2
1
[01]
3
14
[04]
Solid Concrete and Concrete Block Mounting – See Cautions in Step 2.
1.
Level wall plate and mark the hole locations.
2.
Drill pilot holes as illustrated.
3.
Insert lag bolt anchors [04].
4.
Tighten the lag bolts [06] only until the washers [05] are pulled fi rmly
against the wall plate [01].
2
4
[06]
[05]
13mm
10mm
)
(1/2 in.)
(3/8 in.
75 mm
3 in.
6902-002015 <00>

Publicidad

loading

Este manual también es adecuado para:

6902-002015