EAS ELECTRIC EMRH908TX Manual De Instrucciones página 29

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mark Points:
• Mark a point (1) on the horizontal line A, 80
mm to the vertical reference line.
• Repeat this operation on the other side and
on the vertical reference line, checking that
the three marks are leveled.
• Mark a point (2) on the horizontal line B, 60
mm to the vertical reference line.
• Repeat this operation on the other side,
checking that the two marks are on the
same horizontal line.
• Mark a point (3) on the horizontal line C, 100
mm to the vertical reference line . Repeat this
operation on the other side , checking that the
two marks are leveled.
Fix the brackets :
Drill holes at the marked points with a ɸ10
mm drill bit.
Insert the Wall Plugs 11 into the holes.
Fix the hood fixing bracket 20 with 3 screws
10 (5 x 50) at the horizontal line A.
Fix Chimney fixing bracket 21 with 2
screws 10 (5 x 50) at the horizontal line B
29
V.1

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido