INSTALLATION
OUTSIDE MOUNT (OM)
End
bracket
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: The brackets must be flush against a flat mounting surface. Do NOT
mount brackets on curved molding.
•
Position the box brackets at each end of the headrail
•
Position the center support bracket (if included) in the center if using only one.
If more than one center support bracket is included, space them evenly along
the headrail.
•
Use a level to ensure all brackets are even and aligned. Mark the bracket mounting
hole locations, two per bracket, making sure they are square and equally spaced.
Drywall
Anchor
STEP 2: INSTALLING THE BRACKETS
•
Drill pilot holes using a
•
While holding the brackets in place, secure the brackets using two screws per bracket.
•
Use a level to ensure all brackets are even and square with each other.
10
Motorized Tilt Operation
Center support bracket(s)
Screws (2 per bracket)
Center support
bracket(s)
(if included)
⁄
" drill bit using pencil marks as a guide.
1
16
(if included)
Box
bracket