GB
6. Start-up
6.1 Product start-up (power off)
32
Fill, flush and vent the system
B Observe the installation instructions of the
heating circuit distributor.
1. Close the balancing valve with a maximum torque of 3 Nm.
2. Open the thermostat valve.
3. Slide the supplied tube onto the venting screw.
Start-up