Initial Commissioning; Unpacking; Assembly; Cover Removal - Bosch TCE 4420 Manual Original

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 58
en
26 | TCE 4420 | Initial commissioning
Pos.
Name
17
Locking jaws
18
Speed switch
19
Lubricator holder bulb
20
Bead lifting lever
21
Inflation gun
4.

Initial commissioning

4.1

Unpacking

1. Remove the tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of TCE 4420 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Assembly

4.2.1

Cover removal

1. Unscrew the 4 screws of the side cover and remove
the cover itself.
|
1 695 105 426
2010-02-16
Function
Internal or external locking of the rim.
Passing from the first to the second speed.
Mounting paste containing support.
Lifting of the tire edge in demounting and mounting phases.
Tire inflation
4.2.2

Lifting of the tilting column

1. Unscrew the fulcrum-pin screw of the column with
the hex key 6 and remove the pin.
2. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the tilting column and lift
the column with a hoist.
3. Lean the column on the casing.
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Tabla de contenido