Technical Data - Nederman 591 Serie Manual De Instrucciones

Ocultar thumbs Ver también para 591 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15

Technical data

Primary voltage ................................... 0-20 V / 220-240 V
Line fuse (primary)............. ..................................... max. 0 A
Secondary voltage ...........................................................24 V
Phase .................................................................................~
Frequency .................................................................50/60 Hz
Transformer .................................................................. 30 VA
Welding current ......................................................... 8-400 A
Delay time* ................. 0-5 min. ± 25 % ( minute at delivery )
Connection diameter... ........................ Ø25, 60 or 200 mm
* from completion of welding to closing the damper
Mounting instruction - fig. 1
1. Check that the damper blade in the damper housing is in
a completely closed position. Then fit the damper in the duc-
ting system on the inlet side of the fan. For safe connection 3
self-drilling screws in each duct connection is recommended.
Check the shaft end position for closed damper position ac-
cording to picture.
2. Pull the button (A). Fit damper motor in the correct position
according to picture. Push the button (A).
3. Fit operation box on the wall near to the operators working
area.
WARNING!
Risk of personal injuries.
Break the power supply to Operation Boxes and Fan Contactor
before any electrical work is started.
Electrical Installation of Damper Motor and
Accessories - fig. 2
Electrical installation of the damper system should be
done by a qualified electrician.
Connection should be done according to the wiring diagram.
1. Connect the cable between the damper motor and the
operation box. 3 x .0 mm
2
2. For damper systems with sensor; connect the sensor ca-
ble in the operation box.
3. Connect possible spotlight or circuit-breaker for Nederman
Extractor arms.
Check correct voltage connection: block J6.
D3 = light emission diode for voltage connected.
Delay time
The damper system with sensor shuts the damper automati-
cally after welding, with a delay time of  minute. This delay
time can be adjusted with a potentiometer positioned in the
operation box (see picture). The time can be adjusted bet-
ween 0 and 5 minutes +/- 25 %.
Motor Damper
cable is recommended.
This product is designed to meet the requirements of the
relevant EC directives. To maintain this status all installation,
repair and maintenance work must be carried out by qualified
personnel using only original spare parts. Contact your nea-
rest authorised dealer or AB Ph. Nederman & Co. for advice
on technical service or if you require spare parts.
Connection of Several Operation Boxes
- fig. 3
Several operation boxes can be connected when a central
fan should be operated. See wiring diagram.
Connection of Fan Contactor
To start the fan, when any damper is opened, the fan contac-
tor should be connected to block J2 in one of the operation
boxes.
Alternative A
The internal power supply on 24 V AC maximum 80 mA (2 VA)
is used to the fan contactor (Nederman product).
Connect a cable 2 x .0 mm
J2:B. Connect a cable  x .0 mm
Alternative B
The power supply to the fan contactor (not a Nederman pro-
duct) is supplied from an external source, maximum 48 V, 5 A.
Connection to Motor Operated Exhaust Hose
Reels
Connections to Nederman motor operated exhaust hose re-
els should be done according to wiring diagram no. 48346.
Lockable safety switches are recommended for the
whole electric system including the fan.
Important! The switch B (see fig.4) must point upwards
before power connection.
GB
from A to J7:0V and from 96 to
2
from J7:24V to J2:A.
2
9

Publicidad

Tabla de contenido
loading

Tabla de contenido