VTrak Quick Start Guide
VTrak Setup Task List
For complete information about your VTrak E-Class and J-Class subsystems,
see their respective VTrak Product (User) Manuals on the Software CDs.
Task 1: Unpacking the VTrak
The VTrak box contains the following items:
•
VTrak Unit
•
Quick Start Guide
•
Left and right center-mount
brackets
•
Left and right mounting rails
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
At least two persons are required to safely lift the VTrak
subsystem from the box and place it into a rack.
Use the following categories of network cables with VTrak:
•
Cat 6, preferred
•
Cat 5E, minimum
•
RJ11-to-DB9 serial data cable
•
1.5m (4.9 ft) Power cords (2)
•
Software CD with SNMP files,
Product (User) Manual and Quick
Start Guide
Warning
Caution
Important
4