Task 2: Mounting Vtrak In A Rack - Promise Technology VTRAK E-Class Guia De Inicio Rapido

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 75

Task 2: Mounting VTrak in a Rack

The E-Class subsystem installs to the rack using the supplied mounting rails. You
can also use your existing rails.
To install the VTrak subsystem into a rack with the supplied mounting rails:
1.
Check the fit of the mounting rails in your rack system.
2.
Adjust the length of the mounting rails as needed.
3.
Attach the mounting rail assemblies to the outside of the rack posts, using
the attaching screws from your rack system. See Figure 1 on page 6.
Be sure the support is on the bottom facing inward.
4.
Square the rail assemblies in the rack.
5.
Tighten the adjustment screws and the attaching screws.
6.
Place the VTrak subsystem onto the rails.
7.
Secure the VTrak subsystem to the rack through each handle, using the
attaching screws from your rack system.
At least two persons are required to safely lift, place, and
attach the VTrak subsystem into a rack.
Do not lift or move the VTrak subsystem by the handles,
power supplies or the controller units. Hold the subsystem
itself.
Do not install the VTrak subsystem into a rack without rails to
support the subsystem.
Only a qualified electrician who is familiar with the installation
procedure should mount and install the VTrak subsystem.
Be sure all switches are OFF before you install the VTrak
subsystem or plug in the power.
Task 2: Mounting VTrak in a Rack
Cautions
5

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Vtrak j-class

Tabla de contenido