3.
Important Notes
• Installation, commissioning and maintenance are to be performed only by a
qualified technician according to the instructions provided.
• All legal requirements and technical connection regulations specified by the local
water and electricity supply utility companies must be complied with.
• All rights reserved to make technical alterations.
4.
Application
Electric T-junction for AQUA 3000 open system line.
5.
Scope of Delivery
Item
Description
1
Premounted union-nut unit (union nut, seal, splice
ring with pull-relief crown)
2
Splice ring
3
Electric T-junction
4
Only for
Installation and Operating Instructions
4
ZAQUA075
Protective cap
: