CEMO DT-Mobil CUBE 650 l Guia De Inicio Rapido página 7

Ocultar thumbs Ver también para DT-Mobil CUBE 650 l:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
Electric pump 230 V
a
a Mount the pump on the pump support with:
4 x hex nut M6
4 x spring washer A6
4 x washer A6.4
b Remove the protective cap on the delivery hose
and on the pump. Mount the fitting with seal on the
suction side of the pump.
c Remove the protective cap on the connecting line.
Mount the filler hose with delivery nozzle on the
connecting line/spacer.
b
c
Electric pump 230 V
a
a Mount the pump on the pump support with:
4 x hex nut M6
4 x spring washer A6
4 x washer A6.4
b
b Remove the protective cap on the delivery hose
and on the pump. Mount the fitting with seal on the
suction side of the pump.
c There is no spacer on the connecting line.
d
d Mount the meter on the connecting line.
e Mount the filler hose with outlet manifold on the
meter.
GB
with meter
c
e
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dt-mobil cube 980 l

Tabla de contenido