Operation - Qlima PGF 1211 Instrucciones De Uso

Ocultar thumbs Ver también para PGF 1211:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
3. Turn the gas supply ON. And check all the connections with the soapy water
solution. No bubbles may appear!
4. In case of a leak, turn off the gas supply. Tighten any leaking fittings, then
turn the gas supply ON and recheck. Contact your dealer or gas supplier for
assistance if bubbles continue to appear.
DIAGRAMMATICAL REPRESENTATIONS OF OUTDOOR AREAS
Both ends open
ASSEMBLY
Parts supplied
Pic. 3 & Pic. 4
Step 1: Pic. 5
To protect heater from strong wind, anchor the base securely to the ground with
screws. Use the 3 pieces ground fixer as shown in the picture.
Step 2: Pic. 6
Step 3: Pic. 7
Step 4: Pic. 8
Step 5: Pic. 9
Step 6: Pic. 10
Step 7: Pic. 11
Fasten the gas cylinder with the fixation strap

OPERATION

Connect the gas hose to the gas connector.
Please note:
-
The gas hose is NOT included with the heater. Hose must be purchased separate-
ly
-
Minimum / Maximum length gas hose: 60 cm
4
-
Gas connector suitable for:
68
Open
Open side must be >25%
of total wall area
>30% of Total wall area
to be open and unrestricted

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido