Descargar Imprimir esta página

ABB RC/A 8.1 Instrucciones De Montaje página 16

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 36
EN
Commissioning
The function is defined by the programming of the Room-Controller Basis De-
vice. After the power supply is connected, the device functions can be tested
using the manual operation feature
A detailed description of the parameter configuration and commissioning steps
can be found in the technical data and in the product manual. This information
can be downloaded from the Internet site http://www.abb.de/stotz-kontakt
Cleaning
Should the device become soiled, it may be cleaned with a dry cloth. If this
does not suffice, a cloth lightly moistened with soap solution may be used.
On no account should caustic agents or solvents be used.
Maintenance
The device is maintenance free. Should damage have occurred, e.g. due to
transport or storage, no repairs should be carried out.

Publicidad

loading