De Dietrich DOE7900XE Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

90 cm Built-In Oven Installation and Mounting
Place of use for product must be located before starting installation.
Product mustn't be installed in places which are under the effect of
strong air flow.
Carry the product with minimum two people. Do not drag the product so
that floor isn't damaged.
Remove all transportation materials inside and outside the product.
Remove all materials and documents in the product.
Installation Under Counter
Cabin must match the dimensions provided in Figure 2.
A clearance must be provided at the rear part of the cabin as indicated
in the figure so that necessary ventilation can be achieved.
After mounting, the clearance between lower and upper part of the
counter is indicated in Figure 5 with "A". It's for ventilation and shouldn't
be covered.
Installation In An Elevated Cabinet
Cabin must match the dimensions provided in Figure 4.
The clearances with the dimensions indicated in the figure must be
provided at the rear part of cabin, upper and lower sections so that
necessary ventilation can be achieved.
Installation Requirements
Product dimensions are provided in the Figure 3.
Furniture surfaces for mounting and mounting materials to be used
must have a minimum temperature resistance of 100 °C.
Mounting cabin must be secured and its floor must be plane for product
not to tilt over.
Cabin floor must have a minimum strength that would handle a load of
60 kg.
EN
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido