ELECTRICAL CONNECTIONS
NOTE: If using 120VAC, connect black and white
leads to building utility. (See Figure 3)
NOTE: If using 277VAC, connect orange and
white leads to building utility. (See Figure 4)
120VAC
Connect black and white
leads to building utility.
Cap Unused
Orange Wire.
Figure 3
• Cap off all unused wires. In all cases, use standard
wire nuts to connect wires.
RECESSED CEILING MOUNTING
NOTE: Turn off electricity first.
1.
Use screwdriver to open the front cover and connect
the battery connector. (See Figure 5)
Figure 5
Hole Plug
Mounting
End Cap
2. Position recessed kits and bar hangers between
joists. (See Figure 6)
Figure 6
Bar Hanger
Joist
Tighten Screws
After Positioning
NOTE: Make sure bar hangers are hung in the
correct position.
PAGE 2 OF 9
INSTALLATION CONTINUED
277VAC
Connect orange and white
leads to building utility.
Cap Unused
Black Wire.
Figure 4
Front Cover
Screwdriver
Recessed Kit
Joist
3. Temporarily position recessed kits by hammering
nail-in tabs on bar hangers. Once completed,
secure permanently with nails.
NOTE: Bar hangers should be level with bottom
of joists.
4. Adjust height of recessed kits vertically using
adjusting slots. Tighten all screws on adjusting slots
and bar hanger bracket to secure adjusting bracket
and bar hangers.
5. Make proper electrical connections at junction box
in the metal box or at junction box in the ceiling of
building. (See Figure 7)
Figure 7
Recessed Kit
NOTE: If using 120VAC, connect black and white
leads to building utility. (See Figure 3)
NOTE: If using 277VAC, connect orange and
white leads to building utility. (See Figure 4)
6. Connect test switch and LED indicator cables via
connectors.
7.
Secure trim plate by using provided screws.
(See Figure 8)
Figure 8
0621 IH-8561