Finished Wall
Vanity
Leveler
4. Secure the Vanity
Position the vanity against the finished wall.
Verify the vanity is level and plumb.
NOTE: If the vanity is not level, tip the vanity to allow access to the
appropriate leveler(s) and turn the leveler(s) counterclockwise to
raise the vanity, or clockwise to lower it.
Mark two pilot holes an equal distance from the centerpoint of
the mounting rail.
Drill two pilot holes through the mounting rail at the marked
locations.
NOTE: Use fasteners rated at 50 lb (22.68 kg) load bearing to
properly secure the vanity to the finished wall.
Insert a fastener through each of the two drilled holes.
Tighten each fastener until the vanity is flush and secure against
the finished wall.
Kohler Co.
Mounting Rail
Fastener
7
1082745-2-A