Eaton Powerware 5125 Inicio Rápido página 2

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
3.
Secure both rails to the back of the rack with
pan-head screws. Insert the screws through the
clip nuts installed in Step 2.
4.
Secure both rails to the front of the rack with
pan-head screws. Insert the screws through the
center holes of the rail.
NOTE Do not tighten the screws until the UPS or EBM is
installed.
5.
Slide the UPS and any optional EBMs into the rack.
C A U T I O N
The UPS and EBM are heavy. A minimum of two people are
required to lift the cabinets into the rack.
6.
To secure the back of the UPS to the rack, loosen
the wing nut on the rear hold-down bracket and
slide the bracket over the rear of the UPS. Tighten
the wing nut.
7.
Secure the front of the UPS to the rack using
flat-head screws.
2
EATON Powerware
®
5125 (9910-P18) Quick Start for IBM
®
Applications S 164201646 Rev A
Rear Hold-Down
Bracket

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p18

Tabla de contenido