Kohler K-1109 Instrucciones De Instalación página 9

Ocultar thumbs Ver también para K-1109:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Test Run the Whirlpool (cont.)
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation."
Kohler Co.
9
1012844-2-C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1122K-1124K-1357

Tabla de contenido