MARK DRILLING LOCATIONS
Punch out hole centers in template and notch cutout, as
indicated on template.
Place drill template on corner of shower enclosure against
finished wall and level the template as illustrated.
Template must be located flush to facing wall. Mark hole
locations on finished wall. Put pencil mark in top corner.
Reverse template for opposite wall and align back corner
of template with pencil mark and mark hole locations on
that wall. Again flush rearward to corner.
Drill all holes 3/16" diameter.
For the four corner holes, counterbore only through the
finish wall material to allow clearance for the 1/4" lag
screws (5/16" diameter).
For all other hole locations, set shoulderless wall anchors
into holes.
INSTALL CORNER BRACKETS
Loosely mount corner bracket in one of the two following
methods, depending on whether the recommended or
alternate framing method was used. Do not tighten bolts
yet.
FOR RECOMMENDED FRAMING: Use lag screws
through four stainless steel washers to mount corner
bracket (four holes).
FOR ALTERNATE FRAMING: Use lag screws through
stainless steel washers in hole locations #2 and #3 as
illustrated. Use a #8 screw and a #8 flat washer and a
#1/4" stainless steel flat washer in hole locations #1 and
#4.
Kohler Co., Kohler, WI U.S.A.
Put Pencil Mark Here
Wall Corner Inside
Shower
Shower Enclosure
3
Template
Notch
Cut-out
Level
Corner
Bracket
1/4" Washer
#8 Washer
#8
Screw
AB
112896-2-