2. HANDLING
3. INSTALLATION
3.1. Fitting the Kit
3.2. Discharge pipe assembly
3.3. Electrical connection
3.4. Pre-start checks
4. STARTING
4.1 Starting up the group
4.2 Lack of water fault and retries
4.3 Minimum flow
4.4 Adjusting the start-up pressure
6