Descargar Imprimir esta página

Techem 4.1.1 Manual Del Usuario página 16

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 94
Approved installation positions
TE1, IST
Exemplary depictions
TE1 geometry installation:
1
Rinse the pipeline thoroughly.
2
Close the shut-off valves in the inlet and outlet.
3
Relieve the pipeline pressure
4
Unscrew the temporary cover or old meter anti-clockwise.
5
Clean the connector's sealing surfaces and the measuring capsule's O-ring.
6
Grease the connector's sealing surfaces lightly with tap grease.
8
Screw the measuring capsule hand-tight into the connector and tighten it by
max.
/
turn with the Techem hook spanner.
1
4
Turn the computer unit to a position in which it is easily readable.
9
Seal the meter casing.
10
Turn the compact meter to a position in which it is easily readable.
11
IST geometry installation (only variances to TE1)
Steps
1
to
5
and
6
Apply a thin layer of tap grease to the measuring capsule's screw thread and small
O-ring as well as the L -profile seal.
7
Insert L-profile seal in the connector - its flat surface must face upwards.
Installing the temperature sensors
The outlet sensor is either integrated in the measuring capsule or it must be installed
in the connector. The inlet sensor is installed in a special ball valve or immersion pocket
approved for this type of sensor. – This applies vice versa for the inlet variant.
!
You must not change the cable length of the temperature sensors!
When sensors are installed in dip sleeves, they must always be placed on the dip
sleeve base!
16
TE1, IST
8
to
11
as for connection geometry TE1.
TE1, IST
TE1, IST
/
to
1
8

Publicidad

loading