Descargar Imprimir esta página

Schluter Systems DH E RT2/BW Manual De Instrucciones página 9

Ocultar thumbs Ver también para DH E RT2/BW:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42
DH E RT2 / BW
FIG. 6 + 7 - MOUNTING THE THERMOSTAT
1. Mount the thermostat in the wall socket.
2. Fit the frame and carefully press the cover onto the thermostat
- starting with the upper part of the cover, then the lower part of
the cover. Ensure that both the power slide button on the cover
and the power switch pin in the thermostat are down.
3. Click the cover into place by applying light, even pressure.
Warning! Do not apply pressure to the corners of the display
cover or to the display itself.
DO NOT open the thermostat by releasing the four fixing clips on
the back.
FIG. 8 - OPERATING THE THERMOSTAT
There is an ON/OFF switch on the left side of the thermostat: up is
ON - down is OFF.
The resistive touchscreen requires a soft tap with your fingertip to
register the touch.
Installer Wizzard:
The first time the thermostat is connected, push the power slide
button to On "I" The Installer Wizard on the touchscreen will guide
you through the set up of:
1. Region
2. Language
3. Date
4. Time
5. Floor Type
Programming
See user manual: http://www.schlueter-systems.com/dhert2/
© 2016. All rights reserved. Used under license by Schlüter-Systems KG
English
9

Publicidad

loading

Este manual también es adecuado para:

Mcd5-1999-slp3