Application Of The Bituminous Strips - BWT myPOOL POOL'N BOX Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly of the wooden structure may begin without waiting for the slab to cure fully, however, the longer
the delay between building up the wooden structure and filling the pool with water, the greater the risk of
deformation of the wood, particularly if the temperatures are high. You must wait at least 3 weeks for the
concrete to cure before filling the pool with water.
Before starting to assemble the wooden walls, make sure that the slab is free from any defects and that it
is perfectly level. The finish of the concrete slab will determine the correct seating of the walls, the quality
of the pool floor and the finish of the pool. A level defect will be accentuated and visible when the pool is
filled with water. It could also make it impossible to assemble the pool walls. If necessary, correct defects
by sanding or resurfacing the slab.
Your pool is comprised of several slat references, the positions of the slats are illustrated in
Figure
6. There
are specific slats to house the pool fittings (skimmer, return fitting). Assembly of this structure is described
step by step in this section.
6.2

Application of the bituminous strips

Start by unrolling the bituminous strip that will insulate the wooden structure from the concrete slab
(Figure
7).
Figure 7 – Laying the bituminous strips
18/48
2021/02 - Version: D Code : 37311
WOODEN POOLS
BWT myPOOL POOL'N BOX

Publicidad

Tabla de contenido
loading

Tabla de contenido