KS LEV Manual De Instrucciones página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
SADDLE INSTALLATION
When the desired seatpost orientation is determined and the
saddle head clamp parts have been aligned with the front of the
bicycle, the saddle can then be installed.
To install the saddle, replace the two saddle head clamp bolts,
spherical nuts, upper and lower floating clamp in the order in
which they were removed.
Before tightening, place the rails of your saddle between the
upper and lower floating clamps so that the rails seat in the
channel provided by the lower floating clamp.
Spherical Nuts
Spherical Nuts
Saddle Rails
Upper Floating Clamp
Lower Floating Clamp
Head Clamp Bolts
Head Clamp Bolts
4mm
8 N-m
4mm
8 N-m
See note below
See note below
Using a 4mm hex wrench, tighten the two head clamp bolts to the
maximum torque indicated on your KS dropper post head clamp.
Torques may vary by model.
6
8

Publicidad

Tabla de contenido
loading

Productos relacionados para KS LEV

Este manual también es adecuado para:

Lev carbonLev dxLev 272

Tabla de contenido