Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 13
ASSEMBLY - MONTAGE - MONTAJE
MONTAGGIO - MONTAŻ
HARDWARE - IJZERWAREN - QUINCAILLERIE - SCHRAUBENSATZ
FERRETERIA - FERRAMENTA - ZESTAW MONTAŻOWY
G
BOX 1
no. 1
(1b)
(1a)
G
1
1
X
X
(4)
(3)
no. 2
(1b)
(3) (4) (1a)
(5)
G
2
2
X
no. 3
(1b)
(3)
(4)
(6)
G
3
2
X
no. 4
(7)
(3)
(4)
G
2
4
X
no. 5
(8)
G
4
5
X
I
BOX 2
no. 6
(6)
(7)
(8)
I
2
1
X
no. 7
no. 8
(9)
(10)
(11) (12)
I
I
2
2
3
8
X
X
20
ASSEMBLY - MONTAGE - MONTAJE - MONTAGGIO - MONTAŻ
(1b)
(1a)
(2)
(3)
(4)
(1a)
K
BOX 3
not included - niet inbegrepen
non inclus - nicht inbegriffen
no incluido - non incluso
nie dołączone
no. 9
(13)
(14) (15)
4
X

ASSEMBLY STEPS

Please see illustrations at the end of the manual for further assembly instructions.
I
Assembly of spring:
1. Place B2 element between fi rst and second scroll of spring.
2. Place B1 element between second and third scroll of spring. Tilt at an angle B1 element and insert it into B2 element.
Push the whole until it's blocked.
3. Place A1 element between fi rst and second scroll of spring.
4. Assemble from the bottom of spring elements B3 and A2.
5. Assemble spring with anchor by using hardware set no. 9. Screw on the nuts with the ratchet spanner.
6. Place B2 element between fi rst and second scroll of spring (looking from the top).
7. Place B1 element between second and third scroll of spring (looking from the top). Tilt at an angle B1 element and
insert it into B2 element. Push the whole until it's blocked.
8. Place A1 element between fi rst and second scroll of spring (looking from the top).
9. Assemble from the top of spring elements B3 and A2.
10. Assembly spring with suspension frame by using hardware set no 8. Screw on the nuts with the ratchet spanner.
IIa Assembly of spring and fl at anchor:
1. Find a suitable location to install the spring animal. See FIG II. After installation the concrete foundation will need to be
covered with a shock absorbing surface. The use of rubber tiles is recommended.
2. Place the concrete anchor horizontally, using the spirit level, at the desired location and mark the holes.
3. Drill the 4 holes of 90 mm deep.
4. Remove the dust out of the drilled holes.
5. Put the 4 wedge anchors in the holes.
6. Screw on the nuts of the 4 wedge anchors with the ratchet spanner.
IIb Assembly of spring and concrete anchor:
1. Find a suitable location to install the spring animal. Do not dig holes in loose soil or sand. The soil should be stable and
compacted to provide proper support. See FIG II.
2. Dig a hole for the anchor of the metallic spring pedestal. The hole needs to be 700 mm wide at the bottom and 400 mm
deep.
3. Flatten the bottom of the hole and stamp with your feet. Place the metallic spring pedestal straight up in the hole. The
best way is to use a spirit level. You can fi x this position by putting a heavy stone or brick on the lower plate.
4. Mix enough concrete to fi ll the hole. Be careful to follow the manufacturers instructions. Pour concrete into the hole. Be
careful to keep the spring and upper side top plate free of concrete. Make sure the spring is straight using a spirit level.
5. Allow concrete to set overnight before going to step 6.
6. Cover the visible concrete with soil so that the complete ground level is fl at again. Make sure the ground is covered in
a suitable way (eg. rubber tiles, bark, wood chips,...).
III Assembly of the spring toy:
1. Mount the side panels (wings) together to the suspension frame with the handgrip mounted in between. Use hardwa-
reset no 1,2 and 3.
2. Assembly the footrest by using hardware set no 4.
3. Attach the seating to the suspension frame with hardware set no 5.
Remark: The soil under the spring animal requires an adjusted surface that is shock absorbing!
assembly steps
p. 23 - 24
p. 25
p. 26
p. 27
Instructions for use - M174.011 - spring toy in HDPE - 'bird'
EN
9

Publicidad

Tabla de contenido
loading

Tabla de contenido