Marking And Drilling Wall Jamb Mounting Holes; Install Adjustment Blocks - Kohler K-701611 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Remove a Wall
Jamb From each
side panel
Side
Panel

1. Marking and Drilling Wall Jamb Mounting Holes

- Remove a wall jamb from each side panel.
- Measure and mark the appropriate dimension (Dimension A on diagram) on the receptor ledge near the wall;
Model 701611 35 1/8" (89.2cm), Model 701612 47 7/16"(120.5cm), Model 701618 36" (91.4cm).
- Place the sealing groove of the wall jamb toward the outside of the shower. Align the outside leg of the wall jamb
with the mark on the receptor ledge. Using a level, plumb the wall jamb and mark the five wall mounting holes.
Repeat for other wall jambs.
- Lightly center punch the five hole locations for each wall jamb.
- Drill a hole at each location with a 5/16" drill bit.
- Thoroughly clean the receptor ledge and the wall.
- Install the hollow wall anchors into each drilled hole.

2. Install Adjustment Blocks

- Lay wall jamb on a flat surface.
- Slide an adjustment block into each end of the channel of the wall jamb. The base of the adjustment block should
slides under the Wall Jamb Channel Lip.
- Position the adjustment blocks over the holes in the center of the wall jambs.
- To secure block, hold in place and crimp the wall jamb channel lip on both sides of the block. Press down firmly
with the screwdriver blade to crimp wall jamb lip. Tap screwdriver with hammer if necessary.
- Repeat for other wall jamb.
A
1012601-2-
Pencil
Shower
Receptor
Be sure sealing groove
is toward outside of
shower
Adjustment
Screw
Wall
Jamb
Level
A
4
Adjustment
Block
Location
Groove
Wall Jamb
Channel Lip
Wall
Jamb
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-701612K-701618

Tabla de contenido