7A
Flange
Lip
Column
Groove
Screwport
7C
No. 8 x 5/8I
Flathead Screw
Side
Panel
Door
Framework
ILLUSTRATION IS FOR PIVOT SIDE LEFT
7. Install Door Framework
- Place the door framework between the side panels and align the flange lip and strike post lip with the column
grooves as shown in 7A and 7B above.
- Push lips of flange and strike post all the way into the column grooves as shown in 7C and 7D above.
- Secure the door framework to side panels by attaching #8 x 5/8" flathead screws into screw ports of column.
8. Install Bushings and Plugs
- From the top, insert a 1 1/4" bolt through the panel side frame at the column. Place a washer over the bolt and
fasten with a 1/4" nut.
- Insert a 7/8" bolt through the strike post and column. Place a washer over bolt and fasten with a 1/4" nut. Tighten
with the wrenches provided.
- Repeat the procedure for the opposite side with the side frame, column and flange.
- If the door pivots on the right side, insert a bushing into the right side hole of the top and bottom bridge member. If
the door pivots on the left side, insert a bushing into the left hole of the top and bottom bridge members.
- Insert a plug into the opposite hole of the top and bottom bridge members.
Kohler Co.
7B
Strike
Column
Post Lip
Groove
7D
Side
Panel
Side
Frame
1-1/4I
Bolt
Column
1/4I
Nut
Washer
Bushing
Bridge Member
7
Side Frame
Flange
Strike
Post
Column
1/4"
Nut
7/8I
Washer
Bolt
Bridge
Member
Plug
Plug
Bushing
1012601-2-
1-1/4I
Bolt
A