Prepare the Site (cont.)
NOTE: This product requires through-the-floor drain installation. A drain hole will need to be cut to
accommodate the drain connections.
Plumbing
Route the plumbing.
Cap the supplies and check for leaks.
Flooring
Apply water-resistant sealant to the subfloor. This will reduce the risk of water damage.
Apply the finished flooring material prior to installing the bath.
Ensure the finished floor is level before proceeding with the bath installation.
2. Prepare the Bath
WARNING: Risk of personal injury. Wear personal protective equipment and obtain sufficient
help to carefully lift or move the bath. Cast iron baths are extremely heavy. If the cast iron bath is
not lifted properly, personal injury may occur.
NOTICE: The K-7271 (brass pipe) or K-7272 (PVC pipe) bath drain is required for this installation.
NOTICE: To ensure the bath does not rest on the base trim, the bolts on the bottom of the adjustable feet
must have a minimum height of 5/8" (16 mm).
Place protective floor covering or a throw rug near the installation area. This will prevent damage to
the floor and bath when the bath is set down.
With help, remove the bath from its carton and place it on top of blocks on the protective floor
covering.
Install the adjustable feet to the underside of the bath according to the instructions packed with the
feet.
Attach the drain and overflow fittings to the bath according to the drain manufacturer's instructions.
Do not connect the trap at this time.