Descargar Imprimir esta página

Application Areas; Mounting Information - Afriso EURO-INDEX G3/4 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

Application areas

Tamper-proof valve for connection,
maintenance and inspection of diaphragm
expansion vessels in expansion lines of heating
systems and solar systems with a maximum
concentration of 50% glycol in the water.
Application
 Suitable for the installation in closed heating
systems as per DIN EN 12828.
Shut-off devices must be sufficiently secured
against inadvertent closing (e.g. tamper-
proof valve with wire and lead seal)."
 For shutting off expansion tanks from
heating systems for maintenance work
under consideration of DIN 4807 parts 2 and
3.
"Expansion tanks with diaphragms must be
arranged in such a way that the maximum
permanent temperature of 70°C required by
DIN 4807 part 3 cannot be exceeded or can
only be exceeded for a short period of time."
Specifications
Operating temperature range:
Operating pressure:
Emptying rate:

Mounting information

 The drain valve (4) must be screwed into the
G 1/4 threaded connection of the tamper-
proof valve housing. The drain piece must
point down at an angle.
 The tamper-proof valve (3) is installed in the
expansion pipe upstream of the diaphragm
expansion tank (1) according to DIN 4751
part 2.
 Mount the connection screw (2) tightly to the
connection piece of the diaphragm
expansion tank and fasten it to the tamper-
proof valve using the enclosed gasket.
 After installation, the fully open valve (turned
counter-clockwise all the way to the stop)
must be secured against inadvertent closing
by means of wire and a lead seal.
 Procedure for maintenance work at the
Description
 Tamper-proof valve made of brass,
0 - 120 °C
max. 10 bar
 With drain valve
kvs: 0,5 m³/h
 With cap, wire and lead seal
 With screw connection for diaphragm
expansion tank:
Open the seal and remove the cap (5).
-
Close the "tamper-proof valve" using
-
an Allan key size 6, clockwise all the
way to the stop.
Open the drain valve (4) at the side
-
and drain the diaphragm expansion
tank.
Perform the required maintenance
-
work at the diaphragm expansion tank
(1).
Close the drain valve when you are
-
done with the maintenance work.
Open the tamper-proof valve (3) (turn
-
counter-clockwise all the way to the
stop) and secure it with the cap and a
lead seal (5).
Beachten Sie die Hinweise auf der
Rückseite!
connection G 3/4" with shut-off valve,
adjustable with a size 6 Allan key
expansion tank G 3/4".
1 Diaphragm expansion tank
2 Screw connection
3 Tamper-proof valve
4 Drain valve
5 Cap with lead seal and wire

Publicidad

loading

Este manual también es adecuado para:

G1