If the first corner panel is supported by a
1" vinyl sealer (screed), seek assistance
to support the corner panel in a vertical
position until succeeding wall panels are
installed. Wall and corner panels do not
lock to the vinyl sealer (screed).
Select the next panel as indicated on the
floor plan and position it on the floor or sealer
(screed) close enough to the first panel
installed so that section latch engagement
is possible.
Making sure that the two panels are perfectly aligned at the TOP EDGE
and that the VERTICAL JOINT of the two panels are perfectly flush,
turn the section latches on the vertical edge of the panel until they are
completely engaged.
IMPORTANT! Insist that the top edges of the adjoining panels are
aligned perfectly.
Correct
If misalignment is encountered, merely lift the lowest panel edge while
locking to achieve alignment and, when all latches are engaged, permit
the locked panels to resume their normal position on the walk-in floor
or sealer (screed).
Misalignment
DO NOT SHORT-CUT! TAKE ENOUGH TIME TO PROPERLY ALIGN
ALL SECTIONS.