Assembly Instructions for Upper Crash Bars
Note:
Do not !ghten the screws un!l they are completely aligned with the holes.
Before the installa!on, please verify through the manual that all pieces
and parts are complete.
Tools Required:
Hex Allen Wrench Set
Combination Wrench Set
Assembled Kit
Parts Included:
Le" Side Bar
Right Side Bar
Quanity:
1
Quanity:
Allen Bolt
Lock Nut
M8 X 20 galv
M8 galv
TC2
Quanity:
6
Quanity:
4
Calle 76 # 52D - 74 / Telefax: (57+4) 448 8428 / Medellín - Colombia
Central Plate
1
Quanity:
1
Quanity:
Washers
M8 galv
TC3
TC4
Quanity:
4
Quanity:
www.mastechno.com
BMW 1200 WATER COOLED 13-UP
Installa!on
Image 1
1- Start by installing the Central Plate with hardware BJ1,
TC2 y TC5 in the place indicated in the Diagram through
the holes indicated in teh Image 1.
2- Install the Le" and Right Side Bars to the Central Plate
Allen Bolt
M8 X 90 galv
with hardware TC2, TC3 y TC4 as indicated in Image 2 and
the Diagram.
TC1
2
Washers
Steel Bushing
M8 galv
TC5
BJ1
2
Quanity:
2
Image 2