PICTURE 02
PICTURE 03
2. Installation and Pre Operation
2.1 Installation
2.1.1 Placing
Your equipment must be placed and levelled on a dry and firm surface with, preferably,
850 mm high.
850 mm
2.1.2 Electrical Installation
Please verify the voltage informed on the label attached to the cord when you unpack it..
The feeding cord has 3 pins, the central pin is for grounding.
It is mandatory that all 3 pins are correctly connected before turning the equipment on.
IMPORTANT
Make sure the network voltage is the same as indicated on the cord label.
24