Installation And Pre Operation; Installation; Electrical Installation; Important - Skymsen AMP-400 Manual De Instrucciones

Ocultar thumbs Ver también para AMP-400:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PICTURE 02
PICTURE 03

2. Installation and Pre Operation

2.1 Installation

2.1.1 Placing
Your equipment must be placed and levelled on a dry and firm surface with, preferably,
850 mm high.
850 mm

2.1.2 Electrical Installation

Please verify the voltage informed on the label attached to the cord when you unpack it..
The feeding cord has 3 pins, the central pin is for grounding.
It is mandatory that all 3 pins are correctly connected before turning the equipment on.

IMPORTANT

Make sure the network voltage is the same as indicated on the cord label.
24

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido