BOLT-THROUGH MOUNT
D - For installation on work surface with no access for clamp system:
1. Drill 1/2" hole through work surface in desired location.
:
Bolt-Through Mount can accommodate a hole up to
NOTE
4" (102mm) in diameter. If hole is 2" (51mm) or more, cables
can be routed through the hole. For some 2"grommet holes,
cables should be routed before installation of mount to
accommodate cable plugs (cable access is approximately
1.5" x 0.25" with 2" grommets).
2. Position the M8 Base over the work surface hole (J).
3. Align Bolt-Through Plate, foam side up, under the work surface.
Pass the Bolt (K) through the hole in the plate and screw
into M8 base by using 8mm hex key (L).
STEP 2: SMART STOP ADJUSTMENT
In each arm connection, there is an adjustable Smart Stop Ring which can be
positioned to limit the arm's range of motion. Depending on the orientation
of the ring the arms can be set to rotate either 90°, 180°, or 360°. The marked
angle will be in the center of the range of motion. The stop rings must be
configured in such a way that the dynamic link head does not pass behind
the rear edge of the unit.
③
④
⑤
4
①
J
J
K
②
Arm can rotate
without stopping
Arm can rotate 180˚
Arm can rotate 90˚
L