Remove Unit From Carton
Assemble The Unit
1
2
Remove all contents from
With the J part of the wheel
the carton.
support pointing out, slide it
into the bracket and insert
the clevis pin through the
hole and secure with the
retainer. The support may be
adjusted.
Assemble The Unit
On/ Off Switch
5
6
Making sure the tine hole is
With the On/Off switch
aligned with the outer shaft
facing up and on the right
hole, insert the clevis pin
side of the unit, insert the
and secure with the retainer.
handle bolts into each of the
Repeat for the opposite
square holes of the upper
side.
handle and through the
lower handle.
Assemble The Unit
Start The Unit
Primer Bulb
9
10
Place unit on a level surface
Press primer bulb 10 times,
and fill fuel tank. DO NOT
or until fuel is visible
overfill.
Start The Unit
15
16
Move choke lever to
Pull rope 3-5 times to start
Position 2.
engine. Run unit for 30-60
seconds to warm up.
IMPORTANT: READ OPERATOR'S MANUAL THOROUGHLY AND FOLLOW THE SAFE OPERATION PRACTICES BEFORE OPERATING THE UNIT.
NEED HELP?
PART NO. 769-06348 P00
TB146 EC
4-Cycle Cultivator Operator's Manual
3
Tip the unit back so that it
resting on the lower handle.
7
Place the washer and screw
the handle knob onto the
bolt. Hand tighten the
handle knobs until the upper
handle is secure to the lower
handle.
10 X
11
Move choke lever to
Position 1.
3-5 X
17
Continue to squeeze
throttle. Move choke lever
to Position 3.
CALL 1-800-828-5500 IN U.S. OR 1–800–668–1238 IN CANADA
No Tools Required!
4
With the hubs facing each
other, install the tines onto
the shaft. The single tine
should go on first and then
the double tine. Repeat for
the opposite side.
Starter Rope
Tine Shield
8
Tines
Remove the oil plug from the
crankcase, and pour the
entire bottle of oil into the fill
hole.
12
13
Stand in starting position.
SQUEEZE and HOLD
throttle control for ALL
WARNING:
Tines WILL
further steps.
ROTATE on START. Always
stand in starting position with
foot on wheel when starting
the unit.
18
Continue to squeeze
throttle. Run unit for an
additional 60 seconds to
complete warm-up. Unit
may be used during this
time.
Upper Handle
Throttle Control
On/ Off Switch
Handle Knobs
Lower Handle
Fuel Cap
Air Filter Cover
Choke Lever
DIDN'T START?
IF engine doesn't start, go back to step 10.
IF engine fails to start after 2 attempts, move
choke lever to position 3 and pull the starter
rope until engine starts.
IF engine hesitates, return choke to Position
2 and continue to warm-up.
NOTE: unit is properly warmed up when
engine accelerates without hesitation.
5 X
14
Pull rope 5 times.
Single Tine
Dual Tine
Primer Bulb
(9/10)