Descargar Imprimir esta página

RIB KING Manual Del Usuario página 6

Ocultar thumbs Ver también para KING:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 4
1ST PHASE (Adjustments and checks)
1 - Release the motors
2 - Adjust the mechanical stops by moving the leaf by hand into the completely open and closed position
3 - Check correct tightness of the stops
4 - Put the leaves into the intermediate position and
hand so the gears engage.
5 - Put all the SW1 and SW2 microswitches on OFF and the dip 7 of SW1 on ON (in the case of an electric
lock also put dip switches 8-9-10 on ON)
6 - Put DIP 1 on ON. The DL1 LED flashes.
7 - Press the PROG button and hold it. The DL5 and DL3 LEDs on the side of the relays turn on. M1 must open
followed by M2 while PROG is pressed.
Low speed starts after 10 seconds.
Adjust it via the LOW SPEED trimmer.
Turn the TORQUE trimmer clockwise to increase force (if necessary).
8 - Release the PROG button. If necessary, reverse V with W of the motor(s) that close to re-establish
correct movement direction.
9 - Press the PROG button and hokd it. The DL4 and DL6 LEDs on the side of the relays turn on. M2 must close
followed by M1. Keep PROG pressed until the gate has closed completely.
10 - Put DIP1 on OFF. The DL1 LED stops flashing
2nd PHASE (Programming total opening time)
1 - Both leaves are closed. Put DIP 2 on ON. The DL1 LED flashes.
2 - Press PROG. The first leaf opens, recording the times (M2 remains still in the closed position)
3 - When M1 has finished opening, wait 2 seconds and press PROG (M1 times are stored)
4 - The second leaf starts opening, recording the times.
5 - When M2 has finished opening, wait 2 seconds and press PROG (M2 times are stored)
6 - Wait for the length of time wanted before automatic closing and press the PROG button.
7 - M2 closes. When the offset between the two leaves is such that they will not override each other when closing, press PROG to close
M1.
8 - M1 closes with no risk of overriding M2. DL1 stops flashing.
9 - Both motors have stopped. Times are stored
10 - Put DIP2 on OFF.
then lock the motors. Move the leaves slightly by
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
3rd PHASE Programming the remote control
1 - Put DIP 1 on ON and then DIP 2 of SW1 on ON => the DL1 LED flashes for 10 seconds.
2 - Press the key on the remote (normally channel A) within 10 seconds. If the code is stored correctly
the green DL2 LED flashes once.
3 - Code programming time is renewed automatically so the next remote control can be stored.
4 - To end programming wait 10 seconds or press the PROG button briefly => the DL1 LED stops flashing.
5 - Put DIP 1 and DIP 2 back on OFF.
ON
4th PHASE (Programming pedestrian opening times)
1 - Both leaves are closed. Put DIP2 on ON. The DL1 LED flashes quickly.
ON
2 - Put DIP1 on ON. The DL1 LED now flashes slowly.
3 - Make contact between the COM and Ped Butt terminals. The DL1 LED flashes.
4 - When the leaf is opened enough, again make contact between the COM and Ped Butt terminals. This
stops M1.
5 - Wait for the length of time wanted before automatic closing and then again make contact between the COM and Ped Butt terminals.
6 - M1 closes. The times are stored.
7 - Put DIP 1 and DIP2 of SW1 on OFF.
5th PHASE Customising the configuration
The configuration can be modified by moving the various microswitches
Microswitches ON
DIP 3
Automatic closing activated
DIP 4
Photocells active only in closing
ON
DIP 5
Pre-flashing for 3 seconds
DIP 6
K butt command and RADIO ineffective in opening
DIP 7
Slowing down activated
DIP 8
Electric lock activated
ON
DIP 9
Electric lock release stroke and easy release activated
DIP 10
Electric lock engage stroke activated
DIP 11
Black out function activated
(read the manual for more detail)
DIP 12
Reclosing upon passage of the photocells activated
DIP 13
Sensitive edge monitoring SELFTEST activated
ON
The DIP SWITCHES 14-15 and 16 must remain OFF for KING 230V
JP 17 Closed for 2 motors. Open for 1 motor.
JP1, JP2 and JP3 must be closed.
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16
Microswitches OFF
Automatic closing deactivated
Photocells active all the time
Motor and flasher start together
K butt and RADIO step-by-step command
Slowing down not activated
Electric lock deactivated
Electric lock release stroke and easy release deactivated
Electric lock engage stroke deactivated
Black out function deactivated
Reclosing upon passage of the photocells
non activated
Sensitive edge monitoring SELFTEST deactivated
ON
ON
ON
ON
ON
ON
ON

Publicidad

loading

Este manual también es adecuado para:

Ad00709Ad00683Ad00703Ad00683w