Toshiba ССD Manual De Instrucciones página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 74
Indoor unit cassette type
Check the drainage
After wiring and drain piping are completed, check the drainage according to the following
1.
procedure. If necessary, prepare a bucket and cloth to catch and wipe up the water spilled
out.
Connect the AC 220V~240V power to the terminal blocks (L, N terminals) inside the
2.
electrical box.
3. Slowly inject about 1,000 cc of water into the drain pan.(Fig.14)
4.
Operate the unit in cooling mode. Check the drainage through the transparent drain port to
see if any drain leakage happens.
5. When the check is finished, do not forget to cut off the power input.
Fig.14
Caution!
During this operation, the fan will start working. So pay attention to the rotating fan.
Finish the drainage work.
After checking the drainage, make sure that heat insulation is wrapped around the indoor drain
pipe to avoid any dew condensation. (The material should have M1 fireproofing classification)
Plastic container for water intake
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

KcdDccCdm

Tabla de contenido