Fast Ethernet Industrial Media Converter
Side Panel
A—Grounding
ATTENTION: When installing unit, connect the chassis ground first; when uninstalling unit, disconnect chassis ground last.
Wire the grounding terminal to an earth-grounding object to prevent power spikes.
B—Terminal Block Installation
NOTE: Ensure all power is off/disconnected before beginning!
1 Loosen appropriate screws. Insert bare power-supply wires into appropriate terminal
slots (positive wire into positive slot; negative wire into negative slot).
2 Tighten appropriate screws to secure wires.
3 Install block into the device and tighten screws.
C—DIP Switch
1 — C/D
Console/Data selector
2 — LGY
3 — VLAN
4 — RST
Manual Reset
Placement
Desktop Installation
Prior to use, place/position the device:
• on a level surface with at least 25 mm (approx. 1") of clearance for ventilation;
• away from sources of electrical noise: radios,
transmitters, broadband amplifiers;
• within 100 m (approx. 328') of network
devices it's to be connected to.
DIN-Rail Installation
1 Angle spring of mounting clip
over top lip of DIN rail.
2 Push device down till clip clicks onto rail.
3 Ensure installation is stable.
A
1
+
-
-
+
Switch
Position
On
Off
On
Legacy
Off
Unused
On
Off
B
C
2
Enable remote PD reset function.
Turn off remote PD reset function.
Supports standard and non-standard PD power supply.
Only supplies power to standard PD; non-standard PD power supplies not supported.
Reset the remote PD device after 24 hours.
Release reset.
3
PWR1/PWR2 INPUT:DC10V-58V
P1+
P1/2-
P2+
PWR1
PWR2
Description
2
1
Instructions
3
English
3